November 8, 2008Jambatan Sultan Abdul Halim Muadzam Shah / Construction started
What happened at Penang Bridge?
The bridge was inaugurated on 14 September 1985. The current concession holder and maintainer of the bridge is PLUS Expressways. Penang Bridge Sdn Bhd was the concession holder before it was merged with the current concessionaire….Penang Bridge.
Expressway 36 | |
---|---|
History | Opened 3 August 1985, inaugurated 14 September 1985 |
Major junctions |
Who built Penang 2nd bridge?
Penang Second Bridge project The project was implemented as part of the 9th Malaysia Plan. Following the groundbreaking ceremony on 12 November 2006, China Harbour Engineering Co (CHEC) and UEM Construction carried out soil studies and test piling works.
How many people died on Penang Bridge?
The Sultan Abdul Halim ferry terminal bridge collapse was a disaster of the Penang Ferry Service which occurred on 31 July 1988, at the Sultan Abdul Halim Ferry Terminal in Butterworth, Penang, Malaysia. The collapse caused the deaths of 32 people and injured 1,634 people.
Why is Penang Bridge curved?
6. The bridge is curved to discourage speeding and curb drowsiness among drivers. JKSB construction director Hamizol Ngah was quoted in English daily The Star in November 2012 saying that the curvy design was deliberately chosen to reduce traffic accidents.
Who designed the Penang Bridge?
Malaysian Highway Authority
UEM Group
Jambatan Pulau Pinang/Architecture firms
What type of bridge is Penang Bridge?
Cable-stayed bridge
Box girder bridge
Jambatan Pulau Pinang/Bridge type
How long is Penang Second bridge?
78,740′Jambatan Sultan Abdul Halim Muadzam Shah / Total length
What is the history of Penang Second Bridge?
The opening ceremony of the Penang Second Bridge was held at 20:30 MST on 1 March 2014 and was officially opened by the Malaysian Prime Minister, Najib Tun Razak. The bridge was official named as Sultan Abdul Halim Muadzam Shah Bridge after the fourteenth Yang di-Pertuan Agong, the late Tuanku Abdul Halim Muadzam Shah of Kedah.
How many toll plazas are there on the Penang Second Bridge?
There are two toll plazas on the route: the Penang Second Bridge Integrated Toll Plaza (Bandar Cassia PLUS Toll Plaza) and the Penang Second Bridge Toll Plaza (JK2PP Toll Plaza).
When was the Batu Kawan bridge built?
Construction of the bridge, linking Batu Kawan on the mainland and Batu Maung on Penang Island, began in November 2008 and is projected completed on February 2014. The bridge was opened to traffic on 2 March 2014.
What is the longest bridge in Malaysia?
The longest bridge in Malaysia installed with High Damping Natural Rubber Bearing (HDNRB) that provides effective seismic isolation system that enables the bridge to withstand high intensity earthquakes. The bridge’s 2.3 meter diameter bore pile designed for the Main Span bored 127 meter deep is among the deepest in the world.